Process optimization for stable operation of BOG compressor in LNG terminal
    • Process optimization for stable operation of BOG compressor in LNG terminal

    • Low-carbon Chemistry and Chemical Engineering   Vol. 48, Issue 6, Pages: 177-182(2023)
    • 作者机构:

      中海油石化工程有限公司,山东 济南 250101

    • DOI:10.12434/j.issn.2097-2547.20220357    

      CLC:

    扫 描 看 全 文

  • WU Guiliang,YANG Xiangdong,WANG Hongchang,et al.Process optimization for stable operation of BOG compressor in LNG terminal[J].Low-carbon Chemistry and Chemical Engineering,2023,48(06):177-182. DOI: 10.12434/j.issn.2097-2547.20220357.

  •  

0

Views

1

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation and optimization of combined transportation of IFV and ORV after capacity expansion of Qingdao LNG terminal
Route selection and condition limitation of technologies of boil-off gas(BOG) pressurization and reliquefaction in LNG terminal
Analysis on comprehensive utilization scheme of circulating water in LNG terminal and power plant
Dynamic simulation of regulation characteristics and parameter tuning of PID controller for key equipment of LNG terminal

Related Author

No data

Related Institution

Sinopec Tianjin Liquefied Natural Gas Co., Ltd.
SINOPEC Qingdao LNG Co., Ltd.
College of Pipeline and Civil Engineering, China University of Petroleum (East China)
China Chengda Engineering Co.,Ltd.
Chengdu Shenleng Liquefaction Plant Co.,Ltd.
0